Addis Ababa, November 25, 2026 (FMC) – India is preparing to begin trial runs of its first bullet train in May 2027 on a 50-kilometre section between Surat and Bilimora along the Mumbai-Ahmedabad High-Speed Rail Corridor, Indian Railway Minister Ashwini Vaishnaw has announced.
The section will be the first part of the country’s high-speed rail network to undergo testing. Electrification work has been completed, while the signalling systems are expected to be ready by January 2027.
Vaishnaw noted that operating high-speed trains at speeds exceeding 240 kilometres per hour requires specialised engineering standards, as the pressure generated when trains pass each other places significant demands on both rolling stock and railway infrastructure.
The first high-speed rail service is targeted to begin operations in the final quarter of 2027, according to the minister’s earlier announcement on November 20, TV BRICS reported, citing its Indian media partner IANS.
The Mumbai-Ahmedabad corridor is designed to connect two of India’s major economic centres, reduce travel time between the cities and introduce high-speed rail services to the country.